Description
Electricity is supplied to the plant by the Chelan County PUD No. 1.  A 2,300-volt transmission line is adjacent to the facility and crosses Worthen Street underground to a PUD owned transformer near the blower building, which reduces the voltage to 480 volts for use in the plant.  Standby electrical power is provided onsite and is automatically started and switched on-line to critical pieces of equipment. Power reliability is considered to be excellent.  The maximum power outage to the plant has been on the order of 5 to 10 minutes.

In the event of an emergency involving the primary service line or the main transformer, the PUD should be contacted at telephone number 663-8121.

Detailed information regarding the plant's electrical system is included in a separate section.